OBAG2 - Rehabilitation of Various Roads (C14050)
Project Description
The scope of the proposed construction work will include conform grinding, removal and replacement of failed asphalt in localized areas (digouts), striping removal, installation of thermoplastic striping, installation of bicycle signage, shoulder backing, guard rail improvements, signal loop replacement and associated electrical work, ADA upgrades for curb ramps, utility cover adjustments and traffic control. Following the repair of the existing asphalt pavement, the entire roadway (edge of pavement to edge of pavement) will be paved with a layer of asphalt concrete.
Award Status Project C14050
Bid Opening Date: 1/12/2021
Milestone | Action | Date | Documents |
---|---|---|---|
Bid Results | Posted | Project Bid Results | |
Bid Tabulation | Posted | Bid Tab - C14050 | |
Notice of Intent to Award | Posted | NOI - C14050 | |
... | |||
Submitted Bid Books (ranked) | Posted | ||
1 | Argonaut Constructors | ||
2 | Team Ghilotti Inc. | ||
3 | Ghilotti Construction Company | ||
4 | Ghilotti Bros. Inc. | ||
5 | Granite Construction Company | ||
... | |||
Award | Award Date | Approval Date |